Job Reports > Pile Breakers

Kooragang Island

 

Kooragang Island

TAETS 380 Pile Breakers - Circular pile breaker (Full link)
Pile breakers dramatically increase productivity and safety when compared to conventional jack-hammer breaking.

Thyssenkrupp Steelcom has supplied Abigroup the TAETS Type 380 required for the breaking of up to 400 concrete piles at the Kooragang Island project, some of which have a strength of 50 MPa and 10 reinforcement bars. The concrete piles ranged from 600mm to 900mm in diameter. ...read more

 

Cairns

 

Cairns

Taets Pile Breakers were used to make easy work of the cast in-situ concrete piles of the box drain and swimming pool. A Type 314 circular pile breaker with infill links was used to break both the 400mm and 600mm diameter piles. ...read more

 

Gold Coast

 

Gold Coast

Rapcivic were attracted to the speed and low noise operation of hydraulic pile breakers given the dense city location of the development. The Type 380 is the largest hydraulic pile breaker available, capable of breaking circular piles from 600mm to 1800mm in diameter. ...read more

 

Gold Coast

 

Mackay Whitsunday Region

TAETS pilebreaker 314 - Pile breakers dramatically increase productivity and safety when compared to conventional jack-hammer breaking.

The $148 million Forgan Bridge project is a signature project for the department in the Mackay/Whitsunday Region. It is the largest project of its kind undertaken by the region and will reshape a major entrance to the central business distrct. ...read more

 

 

 

 